FAISALABAD
The district administration has sent the PC1 of mega project of construction underpass and flyover at Jhal Khanuana Chowk which will cost Rs2.31 billion. While chairing a meeting, DCO Noorul Amin Mengal examined in details PC1 of the project which had been prepared by the Nespak.
The DCO said that the mega project had been conceived for the facilitation of the people in regard with the smooth flow of traffic in the Inter-section. He said that the project of underpass and flyover construction at Jhal Khanuana Chowk had been devised keeping in view the future requirements and most advance technical designing had been prepared to connect Samundri Road from the top middle of the existing Jhal bridge through flyover. He hoped that work on the project would start during the current month and Jhal bridge would be blocked for traffic after arranging alternative rout for the traffic.
EDO Finance Ayub Khan, EDO Works and Services Muhammad Iqbal, DO Planning Mehr Ramzan and Nespak Resident Engineer Amjad Saeed also attended the meeting.