Engr Mazhar Ali

  • The existing storages at Tarbela, Mangla and Chashma were constructed during 1965-1973 under the Indus Basin Treaty with aggregate design capacity of about 15 MAF. By the year 2010, these storages would have lost about 6 MAF of their capacity due to the situation. Presently, over 35 MAF river ...

    Read More